STEP BY STEP TO CARRY OUT AN INSPECTION OF DELIVERY AND RECEIPT OF CIVIL CONSTRUCTION WORKS

Authors

  • Gustavo Dias de Castro IBAPE/MG
  • Bruna Moreira Beire IBAPE/MG

DOI:

https://doi.org/10.51891/rease.v10i4.13568

Keywords:

Nonconformities. Delivery. Receipt.

Abstract

This article will present the step-by-step instructions for carrying out the Delivery and Receiving of Civil Construction Works procedures. With the aim of guiding both owners and condominiums, in order to prevent the dream of obtaining their own home from becoming a future problem, and builders to avoid fines and terminations in contracts, in order to guarantee their safety and preserve the property -being of everyone who may be part of this context. An approach to a case study of the Government program, Minha Casa, Minha Vida, will also be carried out with the aim of highlighting the main non-conformities related to the delivery and receipt of works, ending with professional guidance on the most relevant aspects to be addressed. carry out the inspection.

Author Biographies

Gustavo Dias de Castro, IBAPE/MG

Pós-graduação em Avaliações e Perícias - PUC Minas e IBAPE/MG Pós-graduação em Engenharia de Orçamentos - PUC Minas Engenheiro Civil - PUC Minas. 

Bruna Moreira Beire, IBAPE/MG

Pós-graduação em Avaliações e Perícias - PUC Minas e IBAPE/MG Engenheira Civil - Universidade Federal de Juiz de Fora.

Published

2024-04-17

How to Cite

Castro, G. D. de, & Beire, B. M. (2024). STEP BY STEP TO CARRY OUT AN INSPECTION OF DELIVERY AND RECEIPT OF CIVIL CONSTRUCTION WORKS. Revista Ibero-Americana De Humanidades, Ciências E Educação, 10(4), 1687–1701. https://doi.org/10.51891/rease.v10i4.13568