RISK MANAGEMENT IN AN INBOUND LOGISTICS ADAPTATION PROJECT IN RESPONSE TO INCREASED PRODUCTION CAPACITY: A CASE STUDY IN AN INDUSTRIAL OPERATION
DOI:
https://doi.org/10.51891/rease.v12i11.32787Keywords:
Risk management, Inbound logistics, Storage capacityAbstract
In the operation examined, the annual review of the production plan showed that inbound logistics would need to handle higher demand. This article examines how structured risk management helped identify, assess, prioritize and address the constraints of that project. The research was conducted as a case study at an operation in the Manaus Industrial Pole that receives, stores and handles components for the two-wheel vehicle industry. Project documents and direct observation were used. The findings were organized into four groups: changes in demand, capacity and resource adaptations, identified risks, and responses with their observed outcomes. Planned production increased from 1,000 to 1,850 motorcycles per day, requiring new assessments of inventory, staffing, material handling and transport. A 5×5 risk matrix was used to classify eight risks and determine which required priority attention. During implementation, the team adjusted work arrangements to carry out the changes without interrupting the production line's supply. The case indicates that risk assessment supported both resource planning and decisions made when difficulties arose during implementation.
Downloads
Downloads
Published
Issue
Section
Categories
License
Atribuição CC BY