(1)
Freitas, R. S.; Pedreiro, M. R. de M. CONTROL OF THE WORK SCHEDULE USING A 4D BIM MODEL. REASE 2023, 9 (10), 362-377. https://doi.org/10.51891/rease.v9i10.11586.